$129,000 | Stuart FL

General Description

Asking price has been improved from $149,000 to $129,000 on 1/28/24. Of the 41' Hatteras conv. models built in this model's run from 1986 to 1991, this hull has many of the preferred options available including the 535hp 6V92 which allow a reasonable 25 kt cruising speed and sea keeping qualities.

A solid, dependable Hatteras Convertible that has been lightly used with only two owners since new. The Detroit Diesel 6v92TA engine meter reads only 791 hours. This boat has always lived in South Florida and recently completed a year-long+ period of updating making this a great opportunity to step in and start enjoying her. CHANGE ORDER has a teak, galley up interior (forward to starboard) with 2 staterooms and one head. The generator has a completed electric end overhaul, 7/2021, and more recently a full mechanical servicing. Rebuilt windlass, New Furuno NavNet3 TZ touch with radar, New Uniden Vhf, and three New self-contained Dometic A/C units, plus all fresh bound-edge carpeting, window treatments, and New modular settees. Throughout the bilges the updates are everywhere including most thru-hull seacocks replaced. Rebuilt freshwater system, updated plumbing system and new Techma freshwater head. New Racor primary fuel filters and fuel lines. Rudder system and steering fully updated. This boat is visually close to original in most respects, but with the extensive updating it will be a great platform for a new owner looking to get into a quality-built convertible for a reasonable price.

Boat is located at a private residence in the Palm City area of Stuart, FL. Some advance appointment may be needed for showings.


Flagler Yachts is pleased to assist you in the purchase of this vessel. This boat is centrally listed by Gilman Yachts of Ft. Lauderdale, Inc.. It is offered as a convenience by this broker/dealer to its clients and is not intended to convey direct representation of a particular vessel

General Information

  • Boat Name CHANGE ORDER
  • Manufacturer Hatteras
  • Model 41 Convertible
  • Model Year 1990

Accomodation

  • Cabins 2
  • Heads 1

Dimensions

  • LOA 41
  • Beam 14

Tankage

  • Fuel Capacity 500|gallon
  • Water Capacity 150|gallon