$3,199,000 | Stuart FL

General Description

This 2021 HATTERAS 59’ GT59 CONVERTIBLE “Change Order” is a 3 stateroom 2 head layout with 600hrs on reliable CAT C32A engines. The engines are still under warranty until 12/7/2025 or 2000 hours.

 This 2021 HATTERAS 59’ GT59 CONVERTIBLE “Change Order” is a 3 stateroom 2 head layout with 600hrs on reliable CAT C32A engines. The engines are still under warranty and warranty can be extended out further. All service is up to date on engines and generators with records. The 2021 59’ HATTERAS CONVERTIBLE is loaded with options and is in very nice condition. Call to inquire for more information or schedule a showing on "Change Order" the 2021 HATTERAS 59’ CONVERTIBLE GT59.

 

HIGHLIGHTS

  • CAT C32A engines with warranty until 12/7/2025 or 2000 hours.
  • 2022 Garmin electronics package
  • 4/2022 Electrosea system added
  • 4/2022 KVH tracvision 7 HD tv added
  • 4/2022 JL Audio system with speakers, subwoofer, and amplifiers added
  • Two generators
  • Mezzanine seating in cockpit
  • Air conditioned flybridge
  • Bow thruster
  • Water maker
  • Ice chipper
  • Underwater lights
  • Sirius/XM weather & radio



Flagler Yachts is pleased to assist you in the purchase of this vessel. This boat is centrally listed by HMY Yacht Sales, Inc.. It is offered as a convenience by this broker/dealer to its clients and is not intended to convey direct representation of a particular vessel

General Information

  • Boat Name Change Order
  • Manufacturer Hatteras
  • Model GT59 Convertible
  • Model Year 2021
  • Displacement 89000

Accomodation

  • Cabins 3
  • Heads 2

Dimensions

  • LOA 59
  • Beam 18
  • Draft 4

Tankage

  • Fuel Capacity 1750|gallon
  • Water Capacity 200|gallon